- Home
- Projects
- Residential
- Zirakpur
- Overview
- Location Map
- Layout Plan
- Floor Plan
- Specifications
Specifications
Structure
Framed Structure
Flooring
- Living/Dining - Vitrified Tiles
- Bedrooms 1 & 2 - Vitrified Tiles
- Bedroom 3 - Wooden Laminate Flooring
- Toilets - Antiskid ceramic tiles
- Kitchen - Vitrified Tiles
- Verandah & Balcony - Antiskid ceramic tiles
- Common Staircase & Landing - Granite upto Ist Floor Kota Stone after first floor
- Main Lift Lobby - Designed flooring in granite.
Toilet
- Dado - Ceramic tiles dado upto door level (7'-0")
- WC - EWC Cascade floor mounted off white shade with low level Cistern
- Wash Basin - Off white shade
- Fittings - CP fittings of standard make
- Other fixtures - Mirror over wash basin in all toilets Towel rail/ring
- Servant Toilet - At every landing
Kitchen
- Kitchen - Modular kitchen
- Dado - Ceramic tiles dado upto 2'-0" high above the working platform
- Working top - Granite Stone
- Sink - Stainless steel sink with single bowl & drain board
- Fittings - Standard CP fittings
- Water supply - Hot & Cold water supply
Joinery
- Door Frame - Well seasoned wooden doorframes.
- Door Shutters
a.) Main Door - Both side teak veneered flush door
b.) Bed Room/Kitchen/Toilet - Moulded doors
c.) Mumty - Flush Door painted - Window frame & shutter - UPVC with marble cill
- Wardrobes - Only niches shall be provided
- Common Staircase handrail - Designed Baluster of MS Square bar & MS Flat with wooden handrail
Electrical & plumbing
- Electrical work - Copper wiring in concealed PVC conduits, sufficient light and power points with designer modular switches. One telephone point and one T.V. antenna point in Drawing Room and each bed room.
- Plumbing work - G.I., C.I. Pipes of reputed make. Provision for geyser point in all toilets. Provision for Aqua Guard point above kitchen counter.
- Lifts - Modern elevators with genset back up and tastefully done up interior.
- Genset - Genset back up for essential services
- Power Back-up - 2 Bed Room-3 KVA, 3 Bed Room-5 KVA
- Fire - Wet risers installed at every floor landing.
Internal Finish
- Walls - Oil Bound Distemper with POP punning
- Ceiling - White Color Oil Bound Distemper, P.O.P. Cornice in all rooms.
External finish
- Textured Paint/Weather proof paint.