2 & 3 BHK Apartments
Area (approx.)3 acres
Site Office Near PSEB Grid, Nabha Road,
Babhat, Zirakpur
Phone: +91-9810414457
+91-9216170569
+91-9216170567
Specifications

Structure

Framed Structure

Flooring

  • Living/Dining - Vitrified Tiles
  • Bedrooms 1 & 2 - Vitrified Tiles
  • Bedroom 3 - Wooden Laminate Flooring
  • Toilets - Antiskid ceramic tiles
  • Kitchen - Vitrified Tiles
  • Verandah & Balcony - Antiskid ceramic tiles
  • Common Staircase & Landing - Granite upto Ist Floor Kota Stone after first floor
  • Main Lift Lobby - Designed flooring in granite.

Toilet

  • Dado - Ceramic tiles dado upto door level (7'-0")
  • WC - EWC Cascade floor mounted off white shade with low level Cistern
  • Wash Basin - Off white shade
  • Fittings - CP fittings of standard make
  • Other fixtures - Mirror over wash basin in all toilets Towel rail/ring
  • Servant Toilet - At every landing

Kitchen

  • Kitchen - Modular kitchen
  • Dado - Ceramic tiles dado upto 2'-0" high above the working platform
  • Working top - Granite Stone
  • Sink - Stainless steel sink with single bowl & drain board
  • Fittings - Standard CP fittings
  • Water supply - Hot & Cold water supply

Joinery

  • Door Frame - Well seasoned wooden doorframes.
  • Door Shutters
    a.) Main Door - Both side teak veneered flush door
    b.) Bed Room/Kitchen/Toilet - Moulded doors
    c.) Mumty - Flush Door painted
  • Window frame & shutter - UPVC with marble cill
  • Wardrobes - Only niches shall be provided
  • Common Staircase handrail - Designed Baluster of MS Square bar & MS Flat with wooden handrail

Electrical & plumbing

  • Electrical work - Copper wiring in concealed PVC conduits, sufficient light and power points with designer modular switches. One telephone point and one T.V. antenna point in Drawing Room and each bed room.
  • Plumbing work - G.I., C.I. Pipes of reputed make. Provision for geyser point in all toilets. Provision for Aqua Guard point above kitchen counter.
  • Lifts - Modern elevators with genset back up and tastefully done up interior.
  • Genset - Genset back up for essential services
  • Power Back-up - 2 Bed Room-3 KVA, 3 Bed Room-5 KVA
  • Fire - Wet risers installed at every floor landing.

Internal Finish

  • Walls - Oil Bound Distemper with POP punning
  • Ceiling - White Color Oil Bound Distemper, P.O.P. Cornice in all rooms.

External finish

  • Textured Paint/Weather proof paint.
Request Site Visit


Yes, I am interested in this project